One builder, the whole build.
We grade the lot, put the utilities in the ground, pour the foundation, frame the house and finish it. There is no handoff between a site contractor and a builder pointing at each other when the schedule slips, because it is the same company.
Thirty years of field experience, an owner on the job site, and a line-item budget written before the first trade is called. CSLB #811516.
How we work
Ground-Up Custom Homes
New houses built start to finish on your lot, from the grading and foundation through finish carpentry and paint, run by the same company the whole way.
Pre-Construction & Budgeting
Real numbers before the plans are stamped. Site feasibility, allowances, lead times and a line-item budget you can hold us to instead of a per-square-foot guess.
Design-Build
One contract for design and construction. We bring the architect and engineer in with us so the drawings and the budget are having the same conversation.
High-End Residential
Heavy timber, steel windows, slab kitchens, custom millwork. The details that take coordination and a superintendent who was swinging a hammer for twenty years first.

Included in the scope
- Site feasibility and lot review
- Pre-construction budgeting and value engineering
- Architect and engineer coordination
- Grading, utilities and foundation self-performed
- Framing, siding, windows and doors
- Drywall, finish carpentry and paint
- Millwork, cabinetry and long lead-time tracking
Custom home questions
- What drives the cost of a custom home out here?
- Site conditions, finish level and how steep the lot is. Site work on a hillside parcel in Placer or El Dorado county can move the budget before a wall goes up, which is why we price the dirt before anyone prices the kitchen.
- Do I need plans before I call you?
- No, and it is usually better if you do not. The cheapest changes are the ones made on a sketch, not after a permit set is stamped.
- How long does a custom home take?
- Plan on ten to sixteen months of construction for most homes, plus design and permitting ahead of it. Jurisdiction matters: Placer County and Loomis move at different speeds than Sacramento.
- Do you handle the site work too?
- Yes. Grading, underground utilities and the foundation are self-performed, which is the main reason our schedules hold.
Start with a real budget
Call 916-252-4545 or send us the lot and whatever drawings you have. We will tell you what it costs to build before you commit to design.


